
Acceptance Testing
UMC can perform line acceptance testing for all water and sewer lines.
Line acceptance testing includes:
- Hydrostatic pressure testing of new water mains and force fed sewer mains.
- Air test and leak isolation of new sewer construction.
- Lateral connections grouting for newly lined pipe.
- Vacuum testing of manholes.
- Cleaning and televising for final inspection.
- Spark testing for vinyl and epoxy lining.
- Pipe deflection testing.